Powered shells for AI data centers
Power is the constraint. Everything else follows. Ultracomputation delivers energized, ready-for-fit-out shells in one to two months — behind the meter, in front of it, or both on one bus.
Sized rack by rack for the hardware that is actually shipping
Take service on either side of the meter
A 138 kV utility service, revenue meter and main transformer when the utility can move. A behind-the-meter island when it cannot. Front of meter, behind the meter, or both landing on one 34.5 kV bus.
quick turn to an energized shell
Firm, dispatchable generation on site
Onsite generation behind the meter carries the load when the grid tie is late, curtailed, or not there yet. Firm capacity, dispatched to the rack, on the same bus as everything else.
Ride through into white space
Storage on the bus rides through utility events and smooths generation, so the hall never sees the disturbance. Unit substations step down into a powered shell with white space ready for your racks — NVL72 at 135 kW today, whatever ships next.
uptime at the bus · the hall never sees the event
What a month of delay costs
Pick the hardware, the site and the deal. The model sizes the fleet from the power, then prices every month the site sits dark — in today’s money, with nothing hard coded to make time win.
Three fleets, one model
Open the modelOne 34.5 kV bus. Utility service in front of the meter; generation and storage behind it; unit substations stepping down into the shell. Representative, not to scale, rev 04.